Post-construction cleaning should be scheduled after all construction and punch-list work is fully completed, and ideally before furniture installation or occupancy.
The space should be free of active trade work so surfaces can be fully cleaned without disruption. Scheduling at the proper stage allows us to perform a thorough final reset—delivering a true move-in-ready finish, not a temporary clean before work resumes.